技改电站(Technological transformation of power stations):
对于技改电站我公司将首先对电站进行现场考查,并作出机组冷却水技改可行性研究报告,供电厂提交上级部门审查。
For the power station undergoing technological transformation, our company will first conduct an on-site inspection of the power station and prepare a feasibility study report on the technological transformation of the cooling water for the units. The power supply plant will then submit it to the superior department for review.
设计需要资料(The design requires materials)
a、厂区枢纽平面布置图(Layout plan of the factory area hub)
b、主厂房纵横剖面图(Longitudinal and transverse sectional views of the main building)
c、主厂房发电机层平面图(Floor plan of the generator floor in the main plant building)
d、主厂房水轮面层平面图(Floor plan of the main plant turbine surface layer)
e、主厂房蜗壳层平面图(Floor plan of the volute in the main plant building)
f、水轮发电机型号、水轮机型号、机组效率(Hydroelectric generator model, turbine model, unit efficiency)
g、机组冷却水量(Cooling water volume of the unit)
h、河水最高温度、年平均温度及最低温度(The maximum temperature, annual average temperature and minimum temperature of the river water)
i、原冷却器相关图纸(Old cooler related drawings)