序号 S.No |
项目名称 Project Name |
装机容量 Installed Capacity(MW) |
水头 Head(m) |
电站位置 Location |
| 1 | 李家岩水库工程供水电站油水气辅机设备 Auxiliary equipment for oil, water and gas in the water supply power station of Li Jiayan Reservoir Project |
2×3.2 | 55 | 四川省崇州市 Chongzhou City, Sichuan Province |
| 2 | 南沫2水电站尾水冷却器 Tail Water Cooler for NAM MO 2 Hydropower station |
2×60.35 | 670 | 老挝川矿省 Chuankang Province, Laos |
| 3 | 库塔总干渠二级水电站技术供水系统设备 Technical water supply system equipment for Level 2 Hydropower Station of the Kuta Main Canal |
2×2.55 | 24 | 新疆库尔勒市 Korla City, Xinjiang |
| 4 | 龚家河电站技术改造工程 The technical renovation project of Gongjiahe Hydropower Station |
2×10 | 120 | 四川省泸定县 Luding County, Sichuan Province |
| 5 | 和平子二级水电站尾水冷却器 Tail Water Cooler for Hepingzi Level 2 Hydropower station |
2×5 | 312 | 四川省盐源县 Yanyuan County, Sichuan Province |
| 6 | 大寨河一级水电站循环冷却器 Tail Water Cooler for Dazhaihe Level 1 Hydropower Station |
2×9 | 150 | 云南省临沧市云县 Yun County, Lincang City, Yunnan Province |
| 7 | 北河水电站尾水冷却器 Tail Water Cooler for Beihe Hydropower station |
3×5.5 | 116 | 云南省临沧市云县 Yun County, Lincang City, Yunnan Province |
| 8 | 轩秀水电站尾水冷却器 Tail Water Cooler for Xuanxiu Hydropower station |
3×7 | 207 | 云南省墨江县 Mojiang County, Yunnan Province |
| 9 | 阿克西朗II水电站技术供水成套设备 Complete sets of technical water supply equipment for AEKSILANG Ⅱ Hydropower station |
2×5.5 | 143 | 印尼苏门答腊省 Sumatra Province, Indonesia |
| 10 | 依补河五级水电站尾水冷却器 Tail Water Cooler for YibuHe Ⅴ Hydropower Station |
2×8 | 600 | 四川省凉山州宁南县 Ningnan County, Liangshan Prefecture, Sichuan Province |



川公网安备 51010702001389号

