序号 S.No |
项目名称 Project Name |
装机容量 Installed Capacity(MW) |
水头 Head(m) |
电站位置 Location |
| 21 | 莫呼查汗水电站循环冷却器 Tail Water Cooler for Mohuchahan Hydropower Station |
2×6 | 240 | 新疆巴州和静县 Hejing County, Bazhou Prefecture, Xinjiang |
| 22 | tangir电站循环冷却器 Tail Water Cooler for tangir Hydropower Station |
3×7 | 263 | 巴基斯坦西北部 Northwestern Pakistan |
| 23 | 怀拉涅河电站循环冷却器 Tail Water Cooler for The Hiraine River Hydropower Station |
2×30 | 600 | 老挝东南部色贡 Sekong, southeastern Laos |
| 24 | 毛俊水库项目电站工程油水气成套(毛俊水库电站+渠首电站) Complete set of oil, water and gas for The power station project of Maojun Reservoir(Maojun Reservoir Power Station + Canal Head Power Station) |
2×5.5+2×2.5 | 62.4 | 湖南省永州市 Yongzhou City, Hunan Province |
| 25 | 先锋水电厂技术改造工程 The technical renovation project for Pioneer Hydropower Station |
2×2 | 8.32 | 四川省成都市郫都区 Pidu district, chengdu city, sichuan province |
| 26 | 王二溪水电站循环冷却器 Tail Water Cooler for Wangerxi Hydropower Station |
3×5 | 9 | 四川省资阳市 Ziyang City, Sichuan Province |
| 27 | 大唐城东水电站技术改造工程 The technical renovation project for Chengdong Hydropower Station of the DaTang Power |
3×28 | 16.3 | 四川省洪雅县 Hongya County, Sichuan Province |
| 28 | KTMD-IV水电站循环冷却器 Tail Water Cooler for KTMD-IV Hydropower Station |
2×9 | 59.13 | 巴基斯坦西北部 Northwestern Pakistan |
| 29 | 218电站技术改造工程 The technical renovation project for 218 Hydropower Station |
4×5 | 86 | 四川省石棉县 Shimian County, Sichuan Province |
| 30 | 清远水利枢纽技术改造工程 The technical renovation project for Qingyuan Water Conservancy Hub |
4×20 | 18 | 广东省清远县 Qingyuan County, Guangdong Province |



川公网安备 51010702001389号

