scroll down
当前位置:首页 - 业绩及案例 - 历年业绩
历年业绩
historical achievement

序号

S.No

项目名称

Project Name

装机容量

Installed Capacity(MW)

水头

Head(m)

电站位置

Location

21

大寨河三级水电站循环冷却器

Tail Water Cooler for Dazhai River Level 3 Hydropower Station

2×8 111

云南省临沧市云县

Yun County, Lincang City, Yunnan Province

22

大石一、二、三级水电站技术改造工程

The technical renovation project for Dashi Level 1、Level 2、Level 3 Hydropower Station

3.3+4+3.2 110-180

云南省临沧市云县

Yun County, Lincang City, Yunnan Province

23

莫呼查汗水电站循环冷却器

Tail Water Cooler for Mohuchahan Hydropower Station

2×6 240

新疆巴州和静县

Hejing County, Bazhou Prefecture, Xinjiang

24

tangir电站循环冷却器

Tail Water Cooler for tangir Hydropower Station

3×7 263

巴基斯坦西北部

Northwestern Pakistan

25

怀拉涅河电站循环冷却器

Tail Water Cooler for The Hiraine River Hydropower Station

2×30 600

老挝东南部色贡

Sekong, southeastern Laos

26

毛俊水库项目电站工程油水气成套(毛俊水库电站+渠首电站)

Complete set of oil, water and gas for The power station project of Maojun Reservoir(Maojun Reservoir Power Station + Canal Head Power Station)

2×5.5+2×2.5 62.4

湖南省永州市

Yongzhou City, Hunan Province

27

先锋水电厂技术改造工程

The technical renovation project for Pioneer Hydropower Station

2×2 8.32

四川省成都市郫都区

Pidu district, chengdu city, sichuan province

28

王二溪水电站循环冷却器

Tail Water Cooler for Wangerxi Hydropower Station

3×5 9

四川省资阳市

Ziyang City, Sichuan Province

29

大唐城东水电站技术改造工程

The technical renovation project for Chengdong Hydropower Station of the DaTang Power

3×28 16.3

四川省洪雅县

Hongya County, Sichuan Province

30

KTMD-IV水电站循环冷却器

Tail Water Cooler for KTMD-IV Hydropower Station

2×9 59.13

巴基斯坦西北部

Northwestern Pakistan

1234567891011
102条记录  每页10条  第3页/共11
  • 地址:中国·四川省成都市金牛区百寿路8号银杏广场1栋1单元516室
  • 电话:028-8757-2918
  • 手机:132-0811-1820 181-0810-2259
  • 邮箱:cdhs123@163.com
官方公众号
语言
你可以选择您所在区域语言: