序号 S.No |
项目名称 Project Name |
装机容量 Installed Capacity(MW) |
水头 Head(m) |
电站位置 Location |
| 61 | 小河水电站技术改造工程 The technical renovation project for XiaoHe Hydropower Station |
3×24 | 216 | 四川省松潘县 Songpan County, Sichuan Province |
| 62 | 喜儿沟水电站循环冷却器 Tail Water Cooler for XiErGou Hydropower Station |
3×24 | 57.8 | 甘肃省舟曲县 Zhouqu County, Gansu Province |
| 63 | 中古水电站循环冷却器 Tail Water Cooler for ZhongGu Hydropower Station |
2×7 | 214 | 四川省九龙县 Jiulong County, Sichuan Province |
| 64 | 三道桥水电站循环冷却器 Tail Water Cooler for SanDaoQiao Hydropower Station |
2×15 | 480 | 四川省康定市 Kangding City, Sichuan Province |
| 65 | 石碉楼二级水电站循环冷却器 Tail Water Cooler for ShiDiaoLou Level 2 Hydropower Station |
2×5 | 594 | 四川省黑水县 Heishui County, Sichuan Province |
| 66 | 天宫堂水电站循环冷却器 Tail Water Cooler for TianGongTang Hydropower Station |
3×5 | 4.37 | 四川省内江市 Neijiang City, Sichuan Province |
| 67 | 吉乃窝嘎水电站循环冷却器 Tail Water Cooler for JiNaiWoGa Hydropower Station |
3×4 | 386 | 四川省甘洛县 Ganluo County, Sichuan Province |
| 68 | 吉乃窝嘎一级水电站循环冷却器 Tail Water Cooler for JiNaiWoGa Level 1 Hydropower Station |
3×4 | 421 | 四川省甘洛县 Ganluo County, Sichuan Province |
| 69 | 白水河水电站循环冷却器 Tail Water Cooler for BaiShuiHe Hydropower Station |
2×1.25 | 850 | 四川省彭州市 Pengzhou City, Sichuan Province |
| 70 | 铁索桥水电站技术改造工程 The technical renovation project for YinSuoQiao Hydropower Station |
2×12 | 28 | 云南省禄劝县 Luquan County, Yunnan Province |



川公网安备 51010702001389号

