scroll down
当前位置:首页 - 业绩及案例 - 历年业绩
历年业绩
historical achievement

序号

S.No

项目名称

Project Name

装机容量

Installed Capacity(MW)

水头

Head(m)

电站位置

Location

11

阿克西朗II水电站技术供水成套设备

Complete sets of technical water supply equipment for AEKSILANG Ⅱ Hydropower station

2×5.5 143

印尼苏门答腊省

Sumatra Province, Indonesia

12

依补河五级水电站尾水冷却器

Tail Water Cooler for YibuHe Ⅴ Hydropower Station

2×8 600

四川省凉山州宁南县

Ningnan County, Liangshan Prefecture, Sichuan Province

13

漾洱水电站技术改造工程

The technical renovation project of Yang 'er Hydropower Station

3×16.6 43

云南省大理市漾洱县

Yang 'er County, Dali City, Yunnan Province

14

营林电站技改工程

The technical renovation project of Yinglin Hydropower station

2×8.5+1×4 306.5

四川省理县

Lixian County, Sichuan Province

15

上如噶特电站机组辅助成套设备

Complete sets of auxiliary equipment for the unit for Upper Rahughat Hydropower station

2×24.25 380

尼泊尔西部开发区

Western Development Zone of Nepal

16

如噶特蒙噶里电站机组辅助成套设备

Complete sets of auxiliary equipment for the unit for Rahughat Mangale Hydropower station

2×17.75 390

尼泊尔西部开发区

Western Development Zone of Nepal

17

Nilgiri一级水电站机组辅助成套设备

Complete sets of auxiliary equipment for the unit for Nilgiri Level 1 Hydropower station

2×20 800

尼泊尔中部本尼

Beni, Nepal

18

Nilgiri二级水电站机组辅助成套设备

Complete sets of auxiliary equipment for the unit for Nilgiri Level 2 Hydropower station

2×36 400

尼泊尔中部本尼

Beni, Nepal

19

大唐汇溪水电站技术改造工程

The technical renovation project for Datang Huixi Hydropower Station

3×25 7.5

四川省天全县

Tianquan County, Sichuan Province

20

国网达州葫芦、高滩坪、魏家洞水电站技术改造工程

The technical renovation project for Dazhou Hulu, Gaotanping and Weijiadong Hydropower Stations of State Grid

2.23+1.5+1.5 28-45

四川省达州市

Dazhou City, Sichuan Province

1234567891011
102条记录  每页10条  第2页/共11
  • 地址:中国·四川省成都市金牛区百寿路8号银杏广场1栋1单元516室
  • 电话:028-8757-2918
  • 手机:132-0811-1820 181-0810-2259
  • 邮箱:cdhs123@163.com
官方公众号
语言
你可以选择您所在区域语言: