序号 S.No |
项目名称 Project Name |
装机容量 Installed Capacity(MW) |
水头 Head(m) |
电站位置 Location |
| 91 | 万马河二级电站循环冷却器 Tail Water Cooler for WanMaHe Level 2 Hydropower Station |
3×6.3 | 350 | 云南省盈江县 Yingjiang County, Yunnan Province |
| 92 | 龙川江一级电站 Tail Water Cooler for LongChuanJiang Level 1 Hydropower Station |
2×12 | 16 | 云南省腾冲市 Tengchong City, Yunnan Province |
| 93 | 新塘房水电站循环冷却器 Tail Water Cooler for XinTangFang Hydropower Station |
3×6 | 55 | 云南省临沧市 Lincang City, Yunnan Province |
| 94 | 大春河一级水电站循环冷却器 Tail Water Cooler for DaCunHe Level 1 Hydropower Station |
2×15 | 762 | 云南省新平县 Xinping County, Yunnan Province |
| 95 | 玛依河一级水电站循环冷却器 Tail Water Cooler for MaYiHe Level 1 Hydropower Station |
3×4 | 215 | 四川省乡城县 Xiangcheng County, Sichuan Province |
| 96 | 仔达寨电站循环冷却器 Tail Water Cooler for ZiDaZhai Hydropower Station |
3×12 | 155.5 | 四川省理县 Lixian County, Sichuan Province |
| 97 | 朝阳电站循环冷却器 Tail Water Cooler for ChaoYang Hydropower Station |
2×20 | 130 | 云南省龙陵县 Longling County, Yunnan Province |
| 98 | 腊门嘎水电站循环冷却器 Tail Water Cooler for LaMengGa Hydropower Station |
2×16 | 700 | 云南省怒江州 Nujiang Prefecture, Yunnan Province |
| 99 | 亚目河二级电站循环冷却器 Tail Water Cooler for YaMuHe Level 2 Hydropower Station |
2×7.5 | 350 | 云南省怒江州 Nujiang Prefecture, Yunnan Province |
| 100 | 亚目河一级电站循环冷却器 Tail Water Cooler for YaMuHe Level 1 Hydropower Station |
3×5 | 500 | 云南省怒江州 Nujiang Prefecture, Yunnan Province |



川公网安备 51010702001389号

